Restauration and Reconstruction Projects
1990-91.
  - Reconstruction of life-size stone-statues of Apollo and Minerva. The project was performed on the comission of Budapest Gallery. The statues were made by Joseph Huber in the beginning of the 19th century and were put on display in the downtown of Budapest in 1993.
1992-93.
  - Restauration of the limestone ornaments of the main gates of a bank-building in downtown Budapest.
1994.
    Restauration of the ornaments as well as the venetian mosaics on the facade of a schoolbuilding in the 7th district of Budapest. Budapest 7th district. (Total surface restaurated was 25 m2). During the project, by coincidence, 2 historical municipal coats of arms, each measuring 6 m2 in size and also made of venetian mosaics, were uncovered and restaurated.
1996.
- Reconstruction of the chandeliers, wall lamps and other illuminating devices in the Main Hall of the Royal Palace of Gödöllő.
1999.
  - Reconstruction of the chandeliers on the first floor in the Károlyi Palace in Budapest and the restauration of the existing chandeliers elsewhere in the building (6 pieces of bronze cast chandeliers as well as 4 wall lamps weighting a total of about 1.2 metric tonnes.)
2001.
  - Reconstruction works in the Main Hall of the National Museum: chandeliers and the iron grid of the floor-heating.
  - Restauration of the 4 gold-gilted wall-lamps in the St. Stephens Cathedral, in Budapest.
  - Restauration of the seven-figure group of statutes, made of zinc, located on the facade of the National Museum of Hungary.
2001-2002.
  - Reconstruction of the neo-rococco chandeliers of the Marie Therese and Gobelin Salons of the Sándor Palace in the Buda Castle, as part of the general restoration of the Sándor Palace (office of the President of the Republic of Hungary).